Did our weekly trip out to the house and things are coming along pretty well. The brick is about 95% complete, the walls have had the texture added, the hardwood floors have been installed and while we were there a crew was working on putting up the trim and staircase hardware.
|
Front of House, Brick and Stone is Up. |
Back of House. |
|
Hardwood floors in the living room. |
Cabinets in the bathroom. |